Make a cut 1 1 2 at the 90 bend of the lineal face and inside locking edge.
Certainteed cement siding installation guide.
Overlap the lineals 1 by fitting the notched lineal over the un notched lineal.
Create a scratch coat in the mortar let dry for the day.
Use a self tapping corrosion resistant ribbed bugle head screw.
Apply a coat of mortar.
Gap where the end meets the corner board photo 7 inset and make sure the other end lands on a stud line.
Click here to learn more from certainteed.
Measure and cut to length the first piece of siding and nail it in place photo 7.
Continuing drying for the day day 6.
Certainteed corporation and representatives of owners of buildings on which the siding had been installed reached a proposed class action settlement.
Nails must be round head non corrosive and either double hot dipped galvanized or stainless steel.
Xx do not install fiber cement directly in contact with surfaces that collect water.
Xx allow a minimum of 1 2 above roof lines porches decks etc.
If using screws to fasten fiber cement siding such as to metal studs be sure that at least three threads penetrate the studs.
Adhesives to install fiber cement siding.
Asphalt roofing cement should meet astm d 4586 type ii.
Continuing drying for the day.
An alternative to using new construction window starter is to use 1 2 j channel as a starter.
Trim 1 1 2 from the nail flange and receiving channel.
Please print this document by clicking the print icon in the web viewer.
Xx leave 1 8 gap between siding and trim surrounding windows and doors.
Staples must not be used.
Install the next piece so its end butts lightly against the first photo 7 inset.
Certainteed will pay 103 9 million to settle the class action approved by the court.
Install 2 layers of weather resistant barrier.
The settlement is intended to resolve disputes between the parties about the performance of the siding.
Use six nails and four spots of asphalt roofing cement for every full shingle for every full shingle as shown below.
6 clearances xx hold back siding a minimum of 6 above the finished grade.
Provides important advice for building owners troubled by gaps that appear in fiber cement exterior siding after the product has been installed and in service for some time.
Apply mortar to back of stone press onto the scratch coat let dry for the day.
Apply 1 spots of asphalt roofing cement under each corner and at about 12 to 13 in from each edge.
Use six nails and four spots of.